Similar Projects
Korean Veteran’s Boulevard Roundabout Mixed Use
New Construction - 1,200,000 SF
Design
$10,000,000 est. value
Nashville, TN 37243

Indian Lake Village Apartments
New Construction
Design
Hendersonville, TN 37075

Deferred Maintenance and Aquatics Project - Package 1
Renovation, Alteration
Bidding
$2,500,000 est. value
Memphis, TN

Wood Pointe Clubhouse
New Construction, Alteration - 1,802 SF
Sub-Bidding
$500,000 to $1,000,000 CJ est. value
Smyrna, TN 37167

City Swimming Pool Repair
Post-Bid
Carthage, TN 37030

Construction Manager at Risk Community Center Expansion
Renovation, Addition
Post-Bid
Sevierville, TN

Resurfacing Concrete Deck at the Town Swimming Pool
Results
Signal Mountain, TN 37377

Student Recreation Center Re-Roof and Repairs Pool Installation
Infrastructure
Results
Memphis, TN 38111

Alta Farms at Cane Ridge
New Construction
Construction
$34,000,000 est. value
Nashville, TN 37013

UTK SRFI New Filter House & Outdoor Pool & Plaza
Infrastructure
Construction
$4,500,000 est. value
Knoxville, TN 37996

Cardinal Point Multi-Family
New Construction, Infrastructure
Pending Verification
White House, TN 37188

YMCA
New Construction, Alteration
Pending Verification
Memphis, TN

Pool Deck and Locker Room Floor Resurfacing
Alteration
Post-Bid
Clinton, TN 37716

Resurfacing of Indoor Pool
Infrastructure
Results
Lebanon, TN 37087

YMCA
New Construction, Alteration - 100,000 SF
Pending Verification
Nashville, TN 37203

Last Updated 04/12/2022 08:43 AM
Project Title

Swimming Pool at the Copper Basin Community Center

Physical Address View project details and contacts
City, State (County) TN   (Polk County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1.Install a new 30'x50' vinyl liner swimming pool inside the shallow end of the existing pool structure. The new pool will need to be plumbed with 8 returns and 4 skimmers. The pump/filter system will need to consist of a 2.65 variable speed pump and a 300-pound sand filter. After the new pool is complete the area outside of the new pool will need to be backfilled with gravel and deck jets will need to be installed approximately every 20' in the new concrete pool deck. (Please Price Separately) 2.Inside the deep end perimeter of the existing pool we would like to add an additional splash pad with 8 splash pad jets. The splash pad will need to be complete with appropriately sized pump/filter system (2.65 variable speed pump & 300 pound sand filter). (Please Price Separately) 3.The existing kiddie pool will need to be renovated with concrete with a drain and one large splash pad jet. This vessel will also have its own appropriately sized pump/filter system (1 hp variable speed pump and 150 pound sand filter). (Please Price Separately) 4.Existing pool deck will need to be cleaned and all cracks filled with mastic joint filler.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents