Similar Projects
Water Source Improvements Project
Infrastructure
Bidding
Los Alamos, NM

Water Systems Well and Booster Station Pump Systems - Operation, Maintenance and Training Services
Infrastructure
Bidding
Los Alamos, NM

Clean Frenchy I Well
Post-Bid
Alamogordo, NM 88310

Corrales Trunk Collector Pipeline (CTCP) Phase 3 Corrales Well 2 Site Improvements and Corrales Reservoir Site and Arsenic Treatment System Improvements
Post-Bid
Albuquerque, NM 87102

Drilling and Developing Replacement Water Well 40
Results
$963,498 est. value
Las Cruces, NM

Valle de Oro National Wildlife Refuge Well RG-118-
Results
Albuquerque, NM

North Valley Elementary School Irrigation Well
Infrastructure
Bidding
$320,000 est. value
La Mesa, NM 88044

Installation of Livestock Well, Livestock Pipeline, Drinking Troughs, Storage Tank and Solar Pumping Plant
Post-Bid
Hernandez, NM 87537

Valle Del Rio Phase II Water System Improvements
Results
$1,402,357 est. value
La Mesa, NM

Well Equipping Phase 2
Infrastructure
Bidding
Portales, NM

Well Repair (3 and 8)
Post-Bid
Clovis, NM 88101

Construction of the Well Equipment and Transmission Line
Results
Maxwell, NM 87728

Sewage and Trash Pumps, Maintenance and Repair
Term Contract
Post-Bid
Santa Fe, NM

2020 Luna Allotment Wells
Results
$25,000 to $100,000 est. value
Silver City, NM

On Call Well and Pump Services
Post-Bid
Alamogordo, NM

Reported 11/23/2021 12:00 AM
Project Title

Drill, Construct, Core and Log a Stratigraphic Well

Physical Address View project details and contacts
City, State (County) Socorro, NM   (Socorro County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The overall objective of the DOE funded project, titled as “San Juan Basin CarbonSAFE Phase III: Ensuring Safe Subsurface Storage of CO2 in Saline Reservoirs” (Abbreviation: SJB CarbonSAFE III), is to perform a comprehensive commercial-scale site characterization of a storage complex located in northwest New Mexico to accelerate the deployment of integrated carbon capture and storage (CCS) technology at the San Juan Generating Station (SJGS). One of the main tasks for this project is to drill, construct, core, and log a stratigraphic (science) well in the area of interest.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents