Similar Projects
Reported | 10/14/2019 10:38 AM |
Project Title | Plant Sciences Building |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC (Wake County) |
Category(s) | Education, Green Building |
Sub-Category(s) | College/University, LEED Certified |
Contracting Method | |
Project Status | Construction Commenced April 2019 |
Bids Due | View project details and contacts |
Estimated Value | $160,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | REBID Packages 03S Site Concrete and Hardscapes, 05F Decorative Metal Railings, 06A Architectural Woodwork & Millwork, 07C Fireproofing, 08A Doors, Frames, and Hardware, 08B Specialty Doors, 09A Drywall, 09C Acoustical Ceilings, 09I Acoustical Treatment, 10F Operable Partitions, 12A Window Treatments, 22A Plumbing, 23A Mechanical, and 25A Building Automation System. Bid Event #3 - General Construction Package: 03S Site Concrete, 04A Masonry, 05F Decorative Glass Railings, 06A Architectural Woodwork, 07B Roofing, 07C Fireproofing, 07D Terracotta and Metal Panels, 08A Doors, Frames and Hardware, 08B Specialty Doors, 08C Curtain Wall and Storefront, 08D Interior Glazing, 09A Drywall and Framing, 09B Stone and Tile, 09C Acoustical Ceilings, 09D Resilient Flooring and Carpet, 09E Terrazzo Flooring, 09F Resinous Flooring, 09H Painting and Wall Covering, 09I Acoustical Wall Treatment, 10A Specialties, 10F Operable Partitions, 12A Window Treatments, 12B Lab Casework, and 13A Environmental Control Rooms Sub bid due on the following packages Bid Package 01B General Trades and Temporary Hoist Bid Package 03A Concrete Bid Package 05A Structural Steel Bid Package 07A Waterproofing 14A Elevators 26S Site Underground Electrical Bid Package 31A Sitework and Site Utilities Bid Package 31C Rammed Aggregate Piers The Plant Sciences Building is 184,815 square foot of new construction planned for Centennial Campus targeting LEED Silver certification. The scope of work includes sitework and infrastructure connections and improvements, rammed aggregate piers, core and shell with interior spaces to include seminar, office, lab, growth chambers, cold storage rooms, and greenhouse space with supporting electrical and mechanical utilities. The greenhouse includes BL2P and BL3P containment zones with an accompanying BSL-3 headhouse. BL2P and BL3P Greenhouse Structure and Glazing, Shading, Greenhouse Lighting, Greenhouse Climate Control System. The Plant Sciences Building is a five story, 183,688 square foot of new construction planned for Centennial Campus targeting LEED Silver certification. The overall project scope of work includes sitework and infrastructure connections and improvements, deep foundations, core and shell with interior spaces to include seminar, office, lab, growth chambers and cold storage rooms, and greenhouse space with supporting electrical and mechanical utilities. The greenhouse includes BL2P and BL3P containment zones with an accompanying BSL-3 headhouse. The following details further describe the work: 1. Earthwork and grading to building foundation requirements with anticipation of approximately 25,000 cy export. 2. Site utility connections to campus chilled water, steam, power, telecommunications, domestic water, fire water, reclaim water, sanitary, and storm. 3. Foundation systems are a combination of aggregate pier deep foundations and spread footings. 4. Building structure is a steel frame with slab on deck. 5. Exterior envelope consisting of brick masonry, composite metal panels, terracotta panels, glazed aluminum curtain walls, exterior sun control devices, and fixed mechanical louvers. 6. Interior spaces including gathering and seminar, education, office, conference, break, and lab. 7. Mechanical spaces to support the general building plus additional greenhouse mechanical support space. 8. Rooftop greenhouse consisting of 11 separate zones. Each zone will have separate climate equipment and controls. The entirety of the greenhouse will be built to a BL2P containment requirement with the exception of one zone which will be built to a BL3P containment requirement. 9. The BL3P greenhouse will be connected to a BSL-3 headhouse space. 10. The greenhouse will have a separate control system from the overall building management system. | ||||||||||||||||||||||||||||||||||||||
Details | 5 Stories Above Grade, 184,815 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |