Similar Projects
Kennedy & McAuliffe Roof Replacements
Post-Bid
Hastings, MN 55033

Hastings Middle School 2021 Roof Replacement
Post-Bid
Hastings, MN 55033

Dakota Cty Cda - Clm Exteriors 2021
Renovation
Results
MN

2021 Oak Hills Elementary School Roof Replacement
Results
$950,000 to $1,000,000 est. value
Lakeville, MN 55044

Roofing Assessment
Term Contract
Post-Bid
MN

2021 Roof Rehabilitation
Results
Rosemount, MN

Roof Replacement
Alteration
Post-Bid
$535,000 est. value
Farmington, MN 55024

2021 Reroofing at Akin Road and Meadowview Elementary Schools
Results
Farmington, MN 55024

Roofing Replacement
Alteration
Post-Bid
Apple Valley, MN 55124

WSC Copper Roof Replacement
Results
$1,850,000 est. value
Apple Valley, MN 55124

Picnic Shelter Roof Replacement
Alteration
Post-Bid
Hastings, MN 55033

Roof Replacement at John Carroll Apartments
Results
South Saint Paul, MN 55075

JSC 98 Section Roof Replacement
Alteration
Results
$580,000 est. value
Hastings, MN 55033

DCTC Campus Roof Repairs
Alteration
Results
Rosemount, MN 55068

Roof Replacement for the Hutchinson, Red Wing, Hastings, Pine City, and Winona National Guard Armories
Alteration
Results
Hastings, Hutchinson, Pine City, Red Wing, Winona, MN 55350

Last Updated 07/11/2022 09:53 AM
Project Title

Lebanon Hills Campground Office Roof Replacement

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of existing shingles, all roofing fasteners, underlayment, and any roof related metal or flashing.Contractor will supply dumpster and dispose of all old material. Contractor will use Winter Guard or similar product in all valleys as well as 4' up from the roof edge and tar paper or equivalent on the rest. Contractor will install 25 year rated minimum or higher architectural shingles. Contractor will install new drip edge and metal flashing. (color should match or be as close as possible to existing) Contractor will use dark brown asphalt shingles to replace existing cedar shingles. Contractor shall replace bad roof decking as needed.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents