Similar Projects
Installation of 4 Mini Split AC Units
Alteration
Bidding
Pueblo, CO 81001

SB267 Replace HVAC System Building 49 and Replace Water Softeners Building 118
Post-Bid
Less than $2,250,000 est. value
Pueblo, CO 81003

Air Conditioning Units Replacement
Post-Bid
Pueblo, CO

Building 3 HVAC Installation
Results
Less than $77,126 est. value
Pueblo, CO 81003

HVAC Installation at SDC Arts Center
Results
Pueblo West, CO 81003

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

SB267 Replace HVAC System 49 Replace Water Softener 118
Results
Less than $350,000 est. value
Pueblo, CO 81003

HVAC and Mechanical Products
Term Contract
Post-Bid

Design/Build - HVAC System Replacement at South High School
Results
Pueblo, CO 81003

Furnace Replacements Services
Term Contract
Post-Bid
Pueblo, CO

Design/Build - HVAC System Replacement at Pueblo Academy of Arts
Results
Pueblo, CO 81005

CU Denver PN20-112394 - SCPP Only
Alteration
Post-Bid
$125,000 est. value
Denver, CO 80204

Replace HVAC Systems, Event Center, Colorado State Fair
Results
Less than $1,200,000 est. value
Pueblo, CO 81004

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

FY21/DQ/PO Industrial Kitchen Blast Chiller for CMHIP NK
Results
Less than $120,000 est. value
Pueblo, CO 81003

Last Updated 07/14/2021 06:27 AM
Project Title

Design/Build - Installation of Owner Provided CRAC HVAC Units - Data Center

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pueblo School District 60 is seeking competitive proposals for the design, engineering, and installation of two new Owner provided JCI-CRAC units. • Place and set (2) Owner furnished JCI CRAC’s with condensers. Interior units to be set on the South exterior wall to include the following: • New concrete housekeeping pads for (2) condensers. • Core drilling for refrigeration piping. • Data room screen to be mounted on existing Unistrut to contain cooling around servers. • New 200-amp panel and feeds to new HVAC equipment. • Discharge ductwork from CRAC’s with diffusers and back draft dampers for lead lag operations. • Refrigeration piping between interior and exterior units. • Pipe insulation. • Connection of DDC Controls • Factory startup from JCI. • Test and Balance of CRAC’s discharge. • Mechanical/ Electrical engineering. • Hoisting. • Permits.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents