Similar Projects
US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Infrastructure
Conception
$10,004,000 CJ est. value
Pasco, WA 99301

I-182/Over Railroad Bridge EB - Bridge Painting
Infrastructure
Conception
$1,733,000 CJ est. value
Pasco, WA 99301

US 12/Snake River Vaughn Hubbard Bridge EB - Repair Floor Beams
Infrastructure
Design
$1,016,000 CJ est. value
Pasco, WA 99301

I-182/Col R Lee-Volpentest Columbia River Bridge EB - Joint Repair
Infrastructure, Renovation
Design
$1,930,000 CJ est. value
Pasco, WA 99301

Process Water Reuse Facility (PWRF) Phase 2: Winter Storage
Infrastructure
Bidding
$48,500,000 CJ est. value
Pasco, WA 99301

Process Water Reuse Facility (PWRF) Phase 2: Winter Storage
Infrastructure
Bidding
$48,500,000 CJ est. value
Pasco, WA 99301

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Burns Pathway Phases 1-3 and North Road 93-Powerline Pathway (Phase 4)
Infrastructure
Results
$467,197 est. value
Pasco, WA 99301

North Industrial Way Storm Water Retrofit and Overlay
Infrastructure
Results
$570,575 est. value
Pasco, WA 99301

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

I-182/Yakima River RC Bremmer Bridges - Joint Repair
Infrastructure, Renovation
Design
$2,689,000 CJ est. value
Pasco, WA 99301

Last Updated 06/30/2023 12:03 PM
Project Title

Argent Road Widening Phase 3

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,472,644 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Aid No. STPUL-3522(002) This Project will construct a new five lane configuration including new sidewalk, shared-use path, and landscaped buffer. Work includes all materials, equipment, and labor for the installation of approximately 5,450 tons of HMA, planing, curb, gutter, sidewalk, and roadway reconstruction for approximately 4,050 linear feet of roadway, construction of pedestrian ramps, pavement marking, storm water utility work, irrigation water main installation, street light installation, reestablishing traffic signal detection systems, landscaping, irrigation service, permanent signing, and other associated work. All in accordance with the Contract Plans, Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge, and Municipal Construction. All bids must be accompanied by a "Good Faith Token" in the form of a Certified Check, Cashier's Check or Bid Bond in the amount of not less than 5 percent (5%) of the total bid. Technical questions regarding the scope of this project should be put in writing up until 72-hours prior to bid opening and directed to Jacob Sevigny, Engineer II, City of Pasco, Public Works, 525 N. 3rd Avenue, PO Box 293, Pasco, WA 99301, Email: sevignyj@pasco-wa.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents