Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Replace Heat Exchangers - 663 and 664
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Chicago, IL 60604

Boiler Replacements
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Arlington Heights, IL 60004

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 ESC - HVAC Equipment Pre-Purchase
Alteration
Post-Bid
Skokie, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

MTC Training Trailers Air Filtration System
Alteration
Post-Bid
Chicago Heights, IL 60411

Last Updated 04/11/2023 12:38 AM
Project Title

Riverside Brookfield High School Air Handling Unit Replacement

Physical Address View project details and contacts
City, State (County) N Riverside, IL 60546   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,265,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, replacing two (2) existing air handling units and two (2) condensing units with new units. Work also includes the removal of the existing suspension system ceiling grid, acoustical ceiling panels, and ductwork on the first and second floors and replacing them with new. The existing light fixtures will need to be removed and re-installed. Supplemental steel framing will be required as indicated in the construction documents. The air handling units, condensing units, and return fan have been pre-purchased by the client. The Contractor that is awarded the Air Handling Unit Replacement project will be responsible for the installation of the pre-purchase equipment. The project is being commissioned by Baumann Consulting. All bids offered must be accompanied by bid security in the form of certified check or bid bond made payable to the Owner in the amount of not less than ten percent (10%) of the amount of the aggregate of the bid as a guarantee that if the bid is accepted, a contract will be entered into and the performance of the contract properly secured. The successful bidder for the project is required to furnish Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the bid amount, with sureties to be approved by the Owner, and in the form required by the Bidding Documents. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. It is the policy of Board of Education of Riverside Brookfield Township High School District 208 to provide equal opportunity to all qualified businesses in the awarding of contracts and accordingly promotes the utilization of diversified businesses to the maximum extent feasible in any contract issued against the solicitation to bid. The Board of Education of Riverside Brookfield Township High School District 208 reserves the right to reject any or all bids or any part thereof.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents