Similar Projects
Lake Bowen - Stormwater Outfalls
Infrastructure
Bidding
$200,000 CJ est. value
Spartanburg, SC 29306

Sewer Force Main Valve Replacement
Infrastructure
Bidding
$4,000,000 CJ est. value
Myrtle Beach, SC 29577

Provide Removal and Replacement for Backflow Device
Renovation
Sub-Bidding
$170,000 CJ est. value
Florence, SC 29506

Pump Station Protective Measure Standby Pump Installation
Renovation
Sub-Bidding
$275,000 CJ est. value
Myrtle Beach, SC 29577

Material and Labor for Plumbing Work - As Needed
Term Contract
Post-Bid
Florence, SC

Plumbing Services
Alteration
Post-Bid
Goose Creek, SC 29445

Provide/Install Water Bottle Stations
Alteration
Results
Anderson, SC

Install Bottle Fill Fountains
Alteration
Results
Anderson, SC

Water Transmission Main Protective Measures Pressure Reducing Valve Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Myrtle Beach, SC 29577

Plumbing Services IDC
Alteration
Post-Bid
Beaufort, SC

Standpipe Replacement Project
Infrastructure, Alteration
Results
$2,000,000 est. value
Lugoff, SC 29078

On Call Plumbing Services
Alteration
Post-Bid
Richland, SC

Plumbing Maintenance and Repairs Services
Alteration
Results
Spartanburg, SC

Water Cooler Installation Services
Alteration
Post-Bid
Anderson, Easley, Pendleton, Seneca, Westminster, SC 29670

Plumbing System
Alteration
Results
Columbia, SC

Last Updated 01/16/2023 12:31 PM
Project Title

Murray-La Saine Montessori School New Traffic Stacking Loop

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412   (Charleston County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of a new 24' wide 2-lane, asphalt paved traffic stacking loop drive on CCSD property, with associated signage, storm drainage and landscaping planting, to improve traffic congestion in the public right-of-way during parent drop-off and pick -up of students.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents