Similar Projects
Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

B403 Extractor Utilities
Design
$25,000 est. value
Tulsa, OK

Haikey Creek Interceptor Phase 1 Improvements
Infrastructure
Bidding
$1,405,000 est. value
Broken Arrow, OK

Development and Implementation of a Backflow Prevention / Cross Connection Control Program - Water and Sewer Department
Infrastructure
Bidding
Tulsa, OK

2nd Street Sanitary Sewer Pipeline Rehabilitation
Infrastructure
Post-Bid
Sand Springs, OK 74063

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Lions Avenue Drainage Improvements
Infrastructure
Results
Less than $416,060 est. value
Broken Arrow, OK

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

Vandever East 6th Addition - City of Broken Arrow
Alteration
Conception
$485,000 est. value
Broken Arrow, OK

New Orleans Street Widening From South 209th East Avenue to South 215th East Avenue
Infrastructure
Bidding
$3,000,000 est. value
Broken Arrow, OK 74011

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Manhole Rehabilitation
Infrastructure
Results
Tulsa, OK

Elm Creek Trunk Sewer Replace - S.1606 - Right of Way
Alteration
Conception
$474,400 est. value
Broken Arrow, OK 74011

Yuma Drive Saddleback Addition Street Repair And Stormwater Improvements
Infrastructure
Bidding
$60,000 est. value
Broken Arrow, OK 74011

Last Updated 06/27/2022 07:22 AM
Project Title

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $4,090,075 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Broken Arrow, Oklahoma. Conceptual plans call for site work for a water / sewer project. A detailed scope has not yet been determined. The project is included in the City of Broken Arrow FY 2023 Capital Improvement Program (CIP). As of June 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents