Similar Projects
Collection and Distribution Pipe and Fittings
Infrastructure
Bidding
Lake Charles, LA

Contract No. 5 Linework Improvements Phase 2
Infrastructure
Bidding
Ethel, LA

2020 PUA CWEF Grant Improvements Altitude Valve at Elevated Storage Tank
Infrastructure
Post-Bid
Less than $65,000 est. value
Donaldsonville, LA

Saint Bernard Drinking Water Revolving Loan Fund Waterline Replacement
Infrastructure
Post-Bid
Chalmette, LA

Hoyle Creek Partial Force Main Replacement
Results
Lincolnton, NC 28092

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

FY 2020 LCDBG Lift Station Improvements
Renovation
Bidding
Jonesboro, LA

WW Collection System Rehabilitation Cured in Place Pipe
Infrastructure
Post-Bid
Lafayette, LA

Sunshine Wastewater Treatment Plant - Effluent Pump Station Rehabilation
Renovation
Results
$359,000 est. value
Sunshine, LA

Water Meters and ITRON ERTS
Infrastructure
Bidding
Alexandria, LA

River Pump Station Hazard Mitigation
Renovation
Post-Bid
Baton Rouge, LA

Construction Of West Monroe Pump Station Repairs
New Construction
Results
Monroe, LA

Transmission Main Replacement
Infrastructure
Bidding
New Orleans, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Lift Station and Blower Controls Electric Panels
New Construction, Alteration
Results
LA

Reported 11/17/2021 12:00 AM
Project Title

LA Highway 64 Regional Pump Station and Forcemain

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA   (East Baton Rouge County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes installation of approximately 6000 linear feet of force main via open cut method, horizontal directional drilling method and jack and bored method approximately 2000 linear feet of gravity main via open cut method and jack and bore method, 11 sanitary sewer manholes, 7 air release and vaccum valves abandonment of an existing sanitary sewer pump station and rehabilitation of an existing sanitary sewer pump station.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents