Similar Projects
Industrial and Distribution Campus
New Construction - 2,104,000 SF
Conception
$10,000,000 CJ est. value
Broomfield, CO 80020

Joslyn Business Park
New Construction
Conception
Denver, CO 80014

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Poudre Learning Center-Hall133, Riparian Restoration
Renovation
Design
Greeley, CO 80631

Southlands-Linear Park Phase 2-160th Avenue-Sheridan Parkway Phase 2 Grading
Infrastructure
Bidding
Broomfield, CO

66th - 68th Avenue and Denali Project
Infrastructure
Bidding
Denver, CO 80238

Whisper Village
New Construction, Alteration
Sub-Bidding
Arvada, CO

Habitat For Humanity
Post-Bid
Denver, CO 80014

Transport Grading and Erosion Construction Project
Post-Bid
Denver, CO

High Mesa Site Prep
Results
Montrose, CO 81401

PKAA, FY2021, Klondike Basin 2020 Mine Closure Project, 644E
Results
Less than $100,000 est. value
Denver, CO 80203

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

Light Industrial and Distribution Campus
New Construction - 2,104,000 SF
Pending Verification
$10,000,000 CJ est. value
Broomfield, CO 80023

Project Indiana / Amazon Fulfillment and Distribution Center
New Construction - 112,104 SF
Conception
$10,000,000 CJ est. value
Arvada, CO 80007

Last Updated 03/09/2022 12:30 PM
Project Title

Burnco Concrete Batch Plant

Physical Address View project details and contacts
City, State (County) Kiowa, CO 80117   (Elbert County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Industrial Warehouse, 2 Stories Above Grade, 6,479 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents