Similar Projects
Orangewood Lakes Water System Improvements Project
Infrastructure
Bidding
$510,000 est. value
New Port Richey, FL 34653

Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

UCF Campus Infrastructure and Utility Production Facility - Industrial Mechanical and Wet-Utility Piping Work
Term Contract
Results
Orlando, FL 32826

NE 35th Avenue Roadway and Water Main Improvements
Infrastructure
Bidding
North Miami Beach, FL

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

CR846 Water Main Replacement Project
Results
Less than $345,000 est. value
Immokalee, FL 34142

Indiantown Road Raw Water Main Crossing (W2011a)
Infrastructure
Bidding
Jupiter, FL 33458

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Design & Post Design Services: Raw Water Supply Line & 30" Force Main Relocation
Results
$200,000 to $300,000 est. value
Pembroke Pines, FL

Last Updated 07/12/2021 03:25 PM
Project Title

Water Main Loop

Physical Address View project details and contacts
City, State (County) Hampton, FL   (Bradford County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all necessary materials and completing all work, including but not limited to labor, transportation, supervision, electricity, water, equipment, startup, testing, training and all other work needed for a complete and operational system

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents