Similar Projects
HVAC Services
Alteration
Bidding
Bloomington, MN

Groveland Elementary School - Unit Ventilator Replacement
Alteration
Bidding
Minnetonka, MN 55345

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

Water System Expansion Utility Improvements
Results
Carver, MN 55315

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Water Meters
Infrastructure
Bidding
Saint Leo, MN

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

HVAC Upgrades
Results
Minneapolis, MN 55411

Deephaven Elementary School Mechanical, Tile and Cabinet Long Term Maintenance
Term Contract, Alteration
Bidding
Wayzata, MN 55391

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Industrial Park South and TH 71 South End Storm Sewer Improvements
Term Contract, Infrastructure
Bidding
Minneapolis, MN

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Last Updated 10/13/2021 03:05 PM
Project Title

Chilled Water System Replacement

Physical Address View project details and contacts
City, State (County) Moorhead, MN   (Clay County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) HVAC, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chiller Replacement Project, involves removal of existing chiller, and installation of new unit for the Rolland Dille Center for the Arts, including all mechanical work involved, plus misc. general construction items & electrical work, as required to accommodate new Chiller, and repair location of existing deleted unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents