Similar Projects
Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision
Bidding
TX

Phase II Detention Improvements and Mass Grading for Sunset Grove Sections 3, 4, 5, & 6 & Partial Ambrose Section 1 and Ditch 9G Improvements
Bidding
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX 77591

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Sedona Section 7 Detention
Bidding
TX

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Reinforced Concrete Pipe, Curb Inlets, Catch Basins, and Joint Sealer Annual Contract
Term Contract
Bidding
Texas City, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Deer Ridge Buyout and Overland Flow Improvements
Bidding
$2,700,000 est. value
League City, TX 77573

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Last Updated 02/24/2021 12:04 PM
Project Title

Highland Bayou Slope Stability Project

Physical Address View project details and contacts
City, State (County) Galveston, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Galveston County is seeking a vendor for the re-construction of approximately 1,500 linear feet of the west bank of the Highland Bayou Diversion Canal, between F.M. 2004 and Jay Road Ditch in Hitchcock, Galveston County, Texas. The existing slope is at a gradient of about 3.5H: 1V in order to prevent further slope failures. In addition, the backslope swales (two) situated behind top of slope need to be reconstructed. Interceptor Swale “A” is approximately 700 linear feet and will outfall into Jay Road Ditch. Interceptor Swale “B” is also about 700 feet in length and will outfall into an existing drainage ditch situated between FM 2004 and the south side of Sunrise Creek subdivision.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents