Similar Projects
St James Farm Near Warrenville - DuPage County
Infrastructure
Conception
$300,000 CJ est. value
Warrenville, IL 60555

St James Farm Near Warrenville - DuPage County
Infrastructure
Conception
$300,000 CJ est. value
Warrenville, IL 60555

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

Plaza Improvements at I-55
Infrastructure
Bidding
$2,000,000 CJ est. value
Willowbrook, IL 60527

Plaza Improvements at I-55
Infrastructure
Bidding
$2,000,000 CJ est. value
Willowbrook, IL 60527

Partial Site Development
Post-Bid
Lombard, IL 60148

Oak Brook Sports Core Improvements
Post-Bid
Less than $450,000 est. value
Oak Brook, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Naper Commons Park Development
Infrastructure
Construction
$250,096 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 2 Townhomes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Naperville, IL 60563

Lexington Trace Parcel Unit 2 Townhomes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Naperville, IL 60563

Ace Hardware at Oak Brook Reserve
Infrastructure, Renovation
Conception
$40,000,000 CJ est. value
Oak Brook, IL 60523

ATP #75 - I-294 Bridge Reconstruction I-55 Ramp A
Demolition, New Construction, Infrastructure
Bidding
$365,000 CJ est. value
Downers Grove, IL 60515

Last Updated 09/02/2022 07:07 AM
Project Title

Fair Oaks Road - Judith Court to Riviera Court Safety Improvement Plans

Physical Address View project details and contacts
City, State (County) Carol Stream, IL 60188   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $553,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

City/County: Carol Stream Section No. 21-00066-00-MS Description: Safety Improvements to Design Retaining Walls, Guardrail, and Culvert Replacement. Proposed Improvements Will Include New Retaining Walls, New Guardrail, and New Culverts. The Purpose of the Project is to Provide Safety to Motorists With New Safety Features Including Wider Shoulders, Retaining Walls, Guardrail, and Barrier Terminal Sections. The Need for This Project is to Prevent Poor Existing Conditions From Causing Further Crashes, Damages, and Injury to Motorists. LOCATION OF PROJECT This project begins at a point along the projected centerline of Fair Oaks Road approximately 185 feet south of the centerline of Jason Court, at Station 99+62 and extends in a northerly direction for a distance of 512.5 feet (0.1 miles) to south of Riviera Court, at Station 104+74.5, approximately 125 feet south of Riviera Court. The project is within the Village of Carol Stream and Wayne Township Road District. The total project gross and net length is 512.5 feet (0.1 miles). ILDOT - Safety Improvements BID SECURITY: Bid security in the amount of not less than 5 percent (5%) of the Bid shall accompany each Bid in accordance with the Bidding Documents. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the Village for one-hundred percent (100%) of the Contract Price, in accordance with the requirements of the Contract Documents. Davis-Bacon Wage decisions are applicable to this project and are only superseded in instances by and where Illinois Prevailing Wages exceed Davis-Bacon in wage, fringe benefits, and/or trade stipulations (requirements). If this project does not start within ninety (90) days of contract award, the wage decisions applicable to the project shall be replaced with the Davis-Bacon Wage decisions that are current as of the date of contract award. Completion Date: JUNE 30, 2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents