Similar Projects
Southwest - Timuquana PS Upgrade Project
Renovation
Bidding
Jacksonville, FL 32210

Lift Stations No. 7 and 20, Water Main, Sewer and Stormwater Improvements
New Construction
Bidding
Jacksonville, FL

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Pump Station 83 Replacement
New Construction
Bidding
$475,000 est. value
Tallahassee, FL 32312

Cooper Creek Lift Station Relocation
Renovation
Post-Bid
$1,200,000 est. value
University Park, FL 34201

Lanark East Lift Station
Results
Carrabelle, FL

HMGP Lift Station 303 Hardening Project
New Construction
Bidding
Green Cove Springs, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Cocoplum 1 Sanitary Pump Station and Force Main Upgrade
Results
Less than $1,850,000 est. value
Miami, FL 33155

HMGP Lift Station 306 Hardening Project
Renovation
Bidding
Green Cove Springs, FL

Reported 05/29/2021 12:00 AM
Project Title

Deep Injection Well Pump Station Coating

Physical Address View project details and contacts
City, State (County) North Port, FL 34287   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To prepare and re-finish pipe coatings, pumps and concrete base structure at the Wastewater Treatment Plant. To maintain and insure the longevity of our piping and pump systems. This will include the surface preparation and painting of the concrete structure, piping, and pump exterior. All items attached to this piping and structure will receive new coatings if they were previously coated

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents