Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Minor Reconstruction
Infrastructure
Bidding
$3,439,152 CJ est. value
Barberton, OH 44203

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

Summit Lake Apartments/2022 Housing Plan Developer
Renovation
Post-Bid
Akron, OH

Four Lane Resurfacing - /SUM-IR 480/SR 91-29.69/19.07
Infrastructure
Results

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Wilcox Meadows Senior Apartments
New Construction
Construction
Twinsburg, OH 44087

22 Exchange Building
Renovation
Construction
Akron, OH 44308

Upscale Apartment Complex
New Construction
Pending Verification
Green, OH 44232

Furnace Street Apartments
Renovation - 64,000 SF
Pending Verification
$9,000,000 CJ est. value
Akron, OH 44308

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

Last Updated 02/20/2023 01:08 PM
Project Title

Village at Town Center Phase 4

Physical Address View project details and contacts
City, State (County) Tallmadge, OH 44278   (Summit County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $12,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of one apartment building and the remodel of retail space into apartments and amenity space. As of February 20, 2023 the project is in planning stage. The Tallmadge City Council has approved a conditional use amendment. The architect has been chosen. Information regarding the general contractor and method of selection has not been released. A construction timeline has not been determined, but is not expected to begin before the second quarter of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 57,400 SF - 3 Stories Above Grade, 36,986 SF. 1 Story Above Grade, 20,414 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents