Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

Reindeer Drive Water Main Replacement
Term Contract
Bidding
Atlanta, GA 30329

Lafayette Road Water Line Replacement
Post-Bid
Fort Oglethorpe, GA 30742

Water System Improvements Division II and III
Post-Bid
Less than $975,000 est. value
Forsyth, GA

Biennial Unit Labor Contract 2019
Results
Blue Ridge, GA 30513

Contract C - Water Main Extensions
Results
Fort Valley, GA 31030

East Newton Transmission Improvements
Infrastructure
Bidding
GA

New Dunbar Road Storm Drainage and Water Main Improvements
Post-Bid
Byron, GA 31008

Manget Street at Lakewood Drive Water and Sanitary Sewer Relocation
Results
Less than $357,198 est. value
Marietta, GA 30060

Meter Change Out Services
Infrastructure
Bidding
GA

Quick Insertion Valves
Term Contract
Post-Bid
Decatur, GA 30030

Site Utilities at Highway 24 and Bypass
Results
Waynesboro, GA 30830

Line Creek Transmission Main and Distribution System
Infrastructure
Bidding
$8,500,000 est. value
GA

Southeast Oconee Pressure Zone Water System Improvements
Post-Bid
Watkinsville, GA 30677

Blanchard Water Treatment Plant Lift Station
Results
Evans, GA 30809

Last Updated 07/29/2021 03:59 PM
Project Title

Georgia Avenue Water Main Replacement

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $301,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of approximately 2,100 L.F. of 6” water main along with associated services, hydrants, fittings, valves, connections and all appurtenances. The time allotted for final completion of work is 120 consecutive calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents