Similar Projects
Last Updated | 11/29/2021 02:38 PM |
Project Title | Mulberry River Stream Restoration |
Physical Address | View project details and contacts |
City, State (County) | Braselton, GA (Barrow County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of, but is not limited to the following major elements: Stabilize the banks of the Mulberry River by creating a more stable pattern and profile. This will be accomplished by modifying the existing stream channel and constructing Bankful Benches, Toe Wood, Rock J Hooks and Low Flow Deflectors to reduce the shear stress on the banks of the River. Approximately 32,000 Cubic Yards of material will be removed and deposited on adjacent lands. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |