Similar Projects
Trail Mountain Emergency Watershed Protection Project
Post-Bid
Castle Dale, UT 84513

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Parowan Pipe Lining with Centripipe Applied Liner
Results
$230,000 to $250,000 est. value
Parowan, UT

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Last Updated 04/21/2020 11:10 AM
Project Title

Construction o the Fairview City – Upper Tollgate Springs Redevelopment

Physical Address View project details and contacts
City, State (County) Fairview, UT   (Sanpete County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $203,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are approximately as follows: Redevelop upper tollgate springs under the direction of the engineer. Replace existing spring collection box. Replace aerial pipe stream crossing. Provide appropriate lining and protection for newly developed springs. 1 Mobilization 1 LS 2 Demolition Clear & Grub 1 LS 3 10” PVC C-900 Pipe (Perforated) 130 LF 4 10” PVC C-900 Pipe (Solid) 40 LF 5 10” DR-17 HDPE Pipe 150 LF 6 Pre-Cast Spring Collection Box 1 EA 7 60 Mil PVC Liner and Backfill 280 SY 8 Clay Dam 40 CY 9 Clay-Type Soil 145 CY 10 2” Minus Clean Wash Gravel 250 CY 11 Excavator Time 80 HRS 12 Dump Truck Time 80 HRS 13 Loader Time 80 HRS 14 Labor 200 HRS 15 Stream Crossing 1 LS 16 Trench Zone Import 45 CY 17 Air Vent 1 EA 18 Re-Seeding 1 LS

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents