Similar Projects
Public Safety Admin Building Locker Room Improvements
Renovation
Conception
$1,181,953 est. value
Peoria, AZ 85345

Desert Meadows Pre-K Building and Additional Parking
Addition, Alteration
Design
Laveen, AZ 85339

Kyrene Traditional Academy Restroom Renovation
Renovation
Design
$500,000 est. value
Chandler, AZ 85226

Parks and Recreation Trails Job Order Contracts
New Construction, Term Contract, Infrastructure
Bidding
$1,000,000 est. value
AZ

East Maricopa Floodway Low Flow Channel
Infrastructure
Bidding
AZ

Zoo Parking Lot - Papago Park
Post-Bid
Phoenix, AZ 85008

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

The Shores North ADA/ABA- Construction of a Sidewalk
Results
Less than $25,000 est. value
Phoenix, AZ

Y--Painted Rock CG - ADA Concrete
Results
Phoenix, AZ 85027

Monte Vista Village Resort
Renovation - 1,283 SF
Construction
$75,043 est. value
Mesa, AZ 85209

Costco #738 - Restroom Remodel
Renovation, Demolition - 911 SF
Construction
$250,000 est. value
Phoenix, AZ 85050

Kyrene de los Lagos Dual Language Academy Restroom Renovation
Renovation, Addition
Design
$600,000 est. value
Phoenix, AZ 85048

Offsite Sewer Installation
Infrastructure
Bidding
Phoenix, AZ 85043

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

Hores North ADA/ABA- Construction of a Sidewalk Slab and Parking Slab
Results
Phoenix, AZ 85004

Last Updated 11/08/2021 12:47 PM
Project Title

System Preservation - Rest Area Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Maricopa County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Restroom/Bath House, Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposed Project is Located in Maricopa County along Interstate 8 at Milepost 83. The work includes Rehabilitating Existing Restroom Buildings, Rehabilitating Water and Wastewater Systems, Widening Parking Lots, ADA Compliance, Striping, and other Related work Items.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents