Similar Projects
I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Bidding

Asphalt Crack Sealing
Post-Bid
Elkhart, IN

2021 Asphalt Paving – Phase 1
Infrastructure
Post-Bid
Middlebury, IN

Concrete Pavement Restoration
Results
IN

Repairs to approach Slab and Repair and Replace Joints
Results
IN

2021 Crack Seal Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

Douglas, Reynolds and 16th Streets Reconstruction
Results
Goshen, IN 46528

2021 Microsurface Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

Ace Cab Parking
New Construction, Demolition
Results
Elkhart, IN 46516

County Road 17
Infrastructure
Post-Bid
Elkhart, IN

Asphalt Resurface and Small Structure Replacement
Results
IN

Franklin Street Resurfacing CCMG
Infrastructure
Post-Bid
Elkhart, IN 46516

Intersection Improvement and Traffic Signals
Results

2021 Paving Program
Infrastructure
Post-Bid
Goshen, IN

IDIQ Pavement Patching
Results

Last Updated 07/23/2021 09:36 AM
Project Title

County Road 4 Improvements

Physical Address View project details and contacts
City, State (County) Goshen, IN   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents