Similar Projects
Saint Leo University Mixed Use Development
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Saint Leo, FL 33574

Saint Leo University Mixed Use Development
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Saint Leo, FL 33574

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

US Wholesale Pipe & Tube Addition & Renovation
New Construction, Renovation, Infrastructure - 36,000 SF
Bidding
$2,000,000 CJ est. value
Holiday, FL 34690

AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Zephyrhills, FL 33545

AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Zephyrhills, FL 33545

2020 Frances Avenue Park Shelter Improvements
New Construction
Results
New Port Richey, FL 34653

Miscellaneous Asphalt Repair
Infrastructure
Results
$100,000 est. value

Flagship Groves Storage
New Construction - 116,000 SF
Construction
$6,676,131 est. value
Wesley Chapel, FL 33544

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sanctuary Ridge
New Construction, Infrastructure
Pending Verification
$46,000,000 CJ est. value
Wesley Chapel, FL 33544

Sanctuary Ridge
New Construction, Infrastructure
Pending Verification
$46,000,000 CJ est. value
Wesley Chapel, FL 33544

Grove at Wesley Chapel
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Wesley Chapel, FL 33543

Speros FL Medical Facility / Shady Hills
New Construction, Infrastructure - 100,000 SF
Design
$85,000,000 CJ est. value
Shady Hills, FL 34610

Last Updated 10/09/2023 07:04 PM
Project Title

Sunwest Park Improvements

Physical Address View project details and contacts
City, State (County) Hudson, FL 34667   (Pasco County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Recreational, Office, Park/Playground, Paving/Reconstruction, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sunwest Beach Park Concessions Building w/ Accessory Storage Building & Kayak Storage Assembly and Pavilion Building This project includes construction of Buildings (Concession, Maintenance, Pavillion, and Storage), Parking Lot, and Pedestrian Trail as per drawings and specs by in Plan Room. Completion within 270 Calendar Days

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents