Similar Projects
The Springs
New Construction
Conception
$64,000,000 est. value
Springboro, OH 45066

Greenhouse
New Construction, Renovation - 237,000 SF
Conception
$121,000,000 est. value
Columbus, OH 43215

Glenwood and Windsor Pool
Renovation, Alteration
Design
$10,000,000 est. value
Columbus, Obetz, OH 43207

Lakewood Park - Foster Pool Renovations
Renovation, Infrastructure
Design
Lakewood, OH 44107

2023 Ernsthausen Recreation Center Pool Room Upgrade Project
Renovation, Infrastructure
Bidding
$690,000 est. value
Norwalk, OH 44857

Village at Washington Trace
New Construction, Infrastructure
Bidding
$50,000,000 est. value
Centerville, OH 45458

Woodlawn Municipal Pool Renovation Project
Post-Bid
Cincinnati, Woodlawn, OH 45215

Rehab Work to the Syracuse Pool
Post-Bid
Syracuse, OH

Worthington Community Center Pools Resurfacing
Results
Worthington, OH 43085

Oakwood Park Pool Substantial Rehabilitation
Results
Lorain, OH 44052

The Eden and Donahue Residential Development
New Construction, Demolition - 273,986 SF
Construction
$25,000,000 est. value
Cincinnati, OH 45202

Artistry One River Plaza
New Construction - 80,000 SF
Construction
$77,000,000 est. value
Cincinnati, OH 45202

Ohio Township Swimming Pool Renovation
Renovation
Design
Hannibal, OH 43915

Splash Park Pad Liner
Infrastructure
Bidding
$80,000 est. value
Galion, OH 44833

Maintenance and Repairs for Campus
Infrastructure
Post-Bid
Cincinnati, OH 45214

Last Updated 06/29/2022 04:25 PM
Project Title

Thornton Park Swimming Pool Water Slide Replacement

Physical Address View project details and contacts
City, State (County) Shaker Heights, OH 44122   (Cuyahoga County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing water slide (purchased and installed in 2004) is deteriorating and the City is proceeding with its removal and replacement. The company will work closely with the City’s Recreation Department to ensure that timelines are adhered to and that the slide and slide features are successfully installed. Please see the attached photos of the existing waterslide. The new waterslide will be installed in the same general area as the old slide. The new slide will use the existing electrical service and water feeding systems as the old slide. The new slide will be single tube style slide with stairs leading to a loading platform. The new slide, slide structure, stairs, motor/pump and all related equipment will be installed in a turnkey manner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents