Similar Projects
ADF-SW Parking Lot Expansion
Term Contract
Design
Las Cruces, NM

127Eax22r0005 - Nmdot Catwalk Restoration
Demolition, Term Contract
Bidding
$100,000 to $250,000 est. value
Glenwood, NM

Parking Lot Reconstruction
Infrastructure
Bidding
NM

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

NM FTFW RIMO 10(1) Rio Mora National Wildlife Refuge Road & Visitor Parking Rehab
Post-Bid
$1,500,000 to $2,500,000 est. value
Watrous, NM

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Coal Avenue Event Street Project
Results
Gallup, NM 87301

Mitchell Street Parking Lot Construction
Infrastructure
Bidding
Clovis, NM

Quartz Hill Trail Project
Post-Bid
NM

Asphalt Overlay at the Bie-T`Siya Day School, Zia
Results
$25,000 to $100,000 est. value
Zia Pueblo, NM

Mona Avenue Roadway, Drainage, and Waterline Improvements
Infrastructure
Bidding
Williamsburg, NM 87901

Telshor Avenue ADA Improvements Phase V
Post-Bid
Las Cruces, NM 88011

El Camino and River Walk Pedestrian and Bicycle Paths Project
Results
Las Vegas, NM 87701

Coal Avenue Event Street Phase II
Infrastructure
Bidding
$3,000,000 est. value
Gallup, NM 87301

Rail Yards Streetscape Project
Infrastructure
Post-Bid
Albuquerque, NM 87102

Last Updated 03/07/2022 09:49 AM
Project Title

Alexander Road Gap Closure for on Street Bike Facilities

Physical Address View project details and contacts
City, State (County) Albuquerque, NM 87107   (Bernalillo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $197,953
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of striping changes to create bicycle lanes and single lanes in each direction with new signing along Alexander Boulevard from Mission Ave to Comanche Rd. The project will also be modifying the existing signal at N Renaissance to include Bicycle Detection and change several vehicle signal heads.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents