Similar Projects
Upgrade HVAC System and Lighting
Alteration
Design
$3,086,485 est. value
Springfield, IL

Generator Electrical Testing
Term Contract
Post-Bid
Springfield, IL 62712

AGR - BG - Electrical Master
Post-Bid
Springfield, IL

Renovate Building 2 For Soldier Support - Electrical
Renovation
Results
Less than $100,000 est. value
Springfield, IL 62702

Demolish and Construct Weigh Station
New Construction, Demolition
Results
Less than $100,000 est. value
Williamsville, IL

Underground Electric Components
Term Contract
Post-Bid
Springfield, IL

Install Generators
Results
Less than $600,000 est. value
Springfield, IL 62703

Power Line Components
Term Contract
Post-Bid
Springfield, IL

138kV Substation Foundations
Results
Springfield, IL

Transformer Alliance
Term Contract
Post-Bid
Springfield, IL

FY2022 Underground Electric Rebuilds Phase 1
Results
Springfield, IL

JPMC Lamps Lighting Replacement Bulbs
Term Contract, Alteration
Post-Bid
Springfield, IL

Eastdale Substation Circuit Breakers
Results
Springfield, IL

Eastdale Substation Major Equipment Purchase
Alteration
Post-Bid
Springfield, IL

Generator Breaker - Switchgear Cubicle Retrofit
Alteration
Results
Springfield, IL

Last Updated 03/11/2022 12:31 PM
Project Title

Generator Replacement

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing natural gas back-up generator. SCOPE OF WORK: Disconnect and remove from site one (1) existing 90 kW Natural Gas Generator and fuel tank from existing concrete pad. Provide and install one (1) new Natural Gas Generator rated at (minimum) 48 kW, 120/240V, 1ph, 60Hz @ 1800 RPM. Offsite disposal of existing Natural Gas Generator shall comply with all applicable IEPA codes and guidelines. Disconnect and remove one (1) 225 A NEMA 1 Automatic Transfer Switch. Provide and install one (1) new (minimum) 400 A NEMA 1 Automatic Transfer Switch rated at 400 A, 240 V, 1ph, and 60 Hz. Additional modification to the work location, outside this scope of work, will not be approved. New Equipment must be compatible with pre-existing components. Provide and install one (1) new natural gas regulator, associated piping, and connections. Provide any necessary modifications to existing power conduit and cable feeders from new generator to new automatic transfer switch to accommodate new generator, and to accommodate new automatic transfer switch. Provide any necessary modifications to existing power conduit and cable feeders from meter to automatic transfer switch to accommodate new automatic transfer switch. Provide equipment to unload and place new emergency generator. Provide System Startup and load testing.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents