Similar Projects
Last Updated | 02/27/2023 12:21 PM |
Project Title | A.C. Reynolds High School Track Replacement |
Physical Address | View project details and contacts |
City, State (County) | Asheville, NC 28803 (Buncombe County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $881,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of February 15, 2023, this project is being rebid due to an insufficient number of qualified bids received at the Thursday, February 2, 2023, formal bid opening. Work shall consist of furnishing all labor, taxes, materials, equipment, services, permits, incidental and implied, to install a complete working system as designed per the attached drawings and specifications. SECTION 329200 The Track & Field Synthetic Surfacing Contractor shall verify the entire track & field subbase and all events to determine that: The synthetic surface for the 400 meter track oval will accurately fit onto the Asphalt Paving base. That slopes and elevations meet required tolerances. No bird baths exceed the allowable limits as specified. The track & field areas will meet or exceed the rules ofthe sport. The Track & Field Synthetic Surfacing Contractor shall provide all labor, materials and equipment to perform the following work: The Track & Field Synthetic Surfacing Contractor is responsible for installing all track & field synthetic surfacing materials and line markings as designated in these specifications. Review Bidding documents and specifications, provide technical assistance, and approve Asphalt Paving base work as required in the specifications. Review and approve installation of all field event in-ground equipment before any track & field synthetic surfacing is installed as specified and shown on the Drawings. Brush and wash down all areas to be surfaced, as often as necessary during the installation of the track and field synthetic surface. Repair all birdbaths as required in these specifications. Install removable track & field synthetic surfacing (full pour polyurethane) plugs in all pole vault boxes and long/triple jump take-off boards (1-inch by 1-inch corner notches in one short side). Install special material (i.e., foam, board, etc.) in slot drain opening to prevent polyurethane from entering the opening. The drainage slot opening shall be neatly trimmed out (vertical cuts), after polyurethane installation, to allow proper drainage to occur. No polyurethane is allowed on the inside ofthe drainage slot opening. This shall apply only ifthe precast slot drain is installed. Repair all damaged areas, clean-up all glue, and remove excess polyurethane, primers and similar products. All trim cuts shall be neat and clean; on all curves the trim-out shall follow a radius line for accuracy and neatness. All questions are due by 10 AM on Wednesday, January 25th |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |