Similar Projects
Roofing Materials and Supplies
Term Contract
Post-Bid
Tucson, AZ

Roofing Repair and Maintenance
Post-Bid

Murphy-Wilmot Library Roof Replacement
Results
$275,000 to $325,000 est. value
Tucson, AZ 85711

Richardson Elementary School Re-Roof
Results
Tucson, AZ 85741

Weatherization at Marana High School Old Gym, Cafeteria and Auditorium
Post-Bid
Tucson, AZ 85743

Z--Organ Pipe Cactus NM Requires the Replacement of the Roof on the Le Building
Results
Less than $25,000 est. value
Ajo, AZ 85321

Keeling Elementary School Roof Restoration Building D
Results
Less than $30,000 est. value
Tucson, AZ 85705

Cabeza Prieta NWR Roof Replacement
Results
Less than $25,000 est. value
Ajo, AZ

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Gymnasium Roof Replacement at Ajo Elementary
Results
Ajo, AZ 85321

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement at Arizona Sonora Residence Hall 83/85
Results
Tucson, AZ 85721

Re-Roofing of Four Buildings for Facilities Management
Results
Tucson, AZ 85719

Re-Roofing of Five Buildings for Facilities Management
Results
Oro Valley, AZ 85737

Rillito Center Roof Replacement
Results
$200,000 to $250,000 est. value
Tucson, AZ 85705

Last Updated 12/12/2019 03:17 PM
Project Title

Z--Organ Pipe Cactus National Monument: Install Shade

Physical Address View project details and contacts
City, State (County) Ajo, AZ 85321   (Pima County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the purchase and installation of an all metal shade Ramada at Bonita Ranch Site. The structure will measure approximately 16ft wide x 16ft long. The pitched metal roof will be 8’6” at its highest, and 8’2” at its lowest.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents