Similar Projects
Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

Raw Water Transmission Main Renewal Project
Infrastructure
Bidding
$300,000 CJ est. value
Atlanta, GA 30334

Morgan Falls Connector Phase 2A
Infrastructure
Bidding
$2,000,000 est. value
Sandy Springs, GA

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Hope Road Townhome Development
Demolition, New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Atlanta, GA 30350

Upper Westside Lofts
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30318

Abernathy North Greenway Upgrades - City of Sandy Springs
Infrastructure
Conception
$1,000,000 est. value
Sandy Springs, GA 30328

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Design
$257,664 CJ est. value
Sandy Springs, GA 30328

Last Updated 07/28/2022 10:03 AM
Project Title

Airfield Shoulder Replacement

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30334   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $9,145,137 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Atlanta's Department of Procurement ("DOP") on behalf of The Department of Aviation, is seeking potential bidders to the project scope involves full depth shoulder replacement, asphalt mill and overlay, crack sealing, replacement of shoulder underdrains, elimination of ponding on asphalt shoulders (regrade the infield at the edge of the shoulder pavement or raise the grades of the shoulder), and eliminating shoulder drop-offs greater than 3". The scope is based on the field evaluation conducted in 2021. The total estimated area of shoulder rehabilitation is 815,000 SY. The estimated area of infield grading is 270,000 SY.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents