Similar Projects
SH-99 - Utilities
Infrastructure
Design
$950,000 CJ est. value
Seminole, OK 74868

Demolition of 121 North Main Street
Demolition, Renovation, Infrastructure
Design
$150,000 CJ est. value
Seminole, OK 74868

Wewoka Water Treatment Plant
New Construction, Infrastructure
Bidding
$16,000,000 CJ est. value
Wewoka, OK 74884

Wewoka Public Works Authority Water Treatment Plant Improvements - Contractor Prequalification
Renovation, Infrastructure
Bidding
$15,000,000 CJ est. value
Wewoka, OK 74884

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Power Line Right-of-Way Clearing
Term Contract
Post-Bid
Seminole, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt) SH-99A From the SH-99 Junction, Extend East Near Seminole
Infrastructure
Results
OK

Remove Existing Light Poles and Lights From 1 (One) Softball Field and Install Light Poles and Lights on 4 (Four) Softball Fields
Infrastructure
Post-Bid
$25,000 CJ est. value
Seminole, OK 74868

Resurface (Asphalt) SH-99A
Infrastructure
Results
OK

Install an Irrigation System
Infrastructure
Post-Bid
$585,000 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$11,500,000 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Seminole, OK 74868

Engineered Fill
Infrastructure
Post-Bid
$50,000 CJ est. value
Seminole, OK 74868

Last Updated 01/30/2023 01:35 AM
Project Title

Pavement Rehabilitation - SH 99

Physical Address View project details and contacts
City, State (County) Seminole, OK 74868   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-99: From 1.0 Miles South of Sh-9, North 3.1 Miles. As of January 30, 2023, the project is in Design status. Anticipated letting month/year is May, 2024. Length : 3.050 Mi OKDOT - Pavement Rehabilitation - SH 99 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents