Similar Projects
Heron Pond - Carpio Sanguinette Park, A and B
Infrastructure
Bidding
Denver, CO

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Bidding
Centennial, CO

Phase 2 - Storm Sewer - Lake
Post-Bid
Wheat Ridge, CO

Sewer Project to Include Rehabilitation of 5 Manholes
Post-Bid
Ramah, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

26th Ave Storm Sewer Construction
Results
Edgewater, CO

Underground Utility Locating Services
Term Contract, Infrastructure
Bidding
Englewood, CO

Brighton PWQ Structure Installation
Post-Bid
Less than $100,000 est. value
Brighton, CO 80601

2020 Sewer Line Rehabilitation
Results
Clifton, CO 81520

Monument Industrial Park
Infrastructure
Bidding
Monument, CO 80132

Bay at the Landings Storm Sewer Inlets Replacement
Post-Bid
Evans, CO 80620

Utility Infrastructure System Improvements and Rehabilitation On-Call
Results
Fort Collins, CO 80522

Pprta Pipe Lining Projects
Infrastructure
Bidding
Colorado Springs, CO

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

5th Street Storm Sewer
Results
Delta, CO 81416

Last Updated 11/18/2021 10:52 AM
Project Title

Storm CMP Rehabilitation Task 6

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,900,000 to $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is Task 6 of the rehabilitation plan recommended in the Wilson study conducted in 2013 and inspection information provided by the City. All segments were identified as being in poor condition and in need of rehabilitation. The design consultant has provided design documents for approximately 3000 linear feet of corrugated metal storm sewers (CMP), ranging in diameter from 24” to 102”. These line segments are located at various locations in the City. The selected contractor will be responsible for completing the rehabilitation through two distinct methods. The first method is cured-in-place-pipe (CIPP) and the second method is centrifugally-cast-concrete-pipe (CCCP). The two different methods satisfy the full range of design considerations.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents