Similar Projects
Madison Food Park Cheese Processing Facility
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Great Falls, MT 59401

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

North Valley Music School at Smith Fields School
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

The Harper
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Kalispell, MT 59901

O'Reilly Auto Parts (CBM) / Cut Bank
New Construction, Infrastructure - 7,225 SF
Bidding
$2,000,000 CJ est. value
Cut Bank, MT 59427

Basin Creek Fuels Reduction - Phase III
Infrastructure
Bidding
$2,000,000 CJ est. value
Butte, MT 59701

Lewistown Fire Warehouse Addition
Addition, Demolition, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Lewistown, MT 59457

Graves Creek Temporary Bridge Road No. 367 (M.p. 5.90)
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Thompson Falls, MT 59873

Phase 4B Water System Improvements
New Construction, Infrastructure
Results
$2,749,940 CJ est. value
Cut Bank, MT 59427

Phase 4B Water System Improvements
New Construction, Infrastructure
Results
$2,749,940 CJ est. value
Cut Bank, MT 59427

406 Spa and Coffee Shop Expansion
Addition, Demolition, Infrastructure - 2,277 SF
Construction
$600,000 CJ est. value
Kalispell, MT 59901

FTH Building 1020 Physical Fitness Add/Alt, Department of Military Affairs
Addition, Demolition, Renovation, Infrastructure
Construction
$694,900 CJ est. value
Helena, MT 59602

Flathead Valley Youth Center - Phase 4
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Kalispell, MT 59901

Three Rivers Bank
New Construction, Infrastructure - 6,300 SF
Pending Verification
$1,000,000 CJ est. value
Whitefish, MT 59937

Street Improvements - Maintenance and Rehabilitation (Mill and Overlay) - FY21 - STR71-21 - City of Bozeman
Infrastructure
Conception
$550,000 CJ est. value
Bozeman, MT 59715

Last Updated 10/16/2023 04:41 PM
Project Title

Little River Trading Post Fuel System Removal and Replacement

Physical Address View project details and contacts
City, State (County) Harlem, MT 59526   (Blaine County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of construction of the addition and remodel of the existing Little River Trading post gas station/convenience store. Work will include the removal and replacement of four underground single walled steel tanks (UST) and associated equipment (System), completion of a tank removal site assessment in association with that work, backfill of the former tank excavation area, the final design, procurement and installation of a new UST System according to the specifications in this document. This solicitation is subject to the Indian Preference procedures set forth in 24 CFR 1000.52; and, generally, the provisions of 2 CFR 200 Methods of Procurement; and the Fort Belknap Tribal Employment Rights Ordinance (TERO). Contractors must obtain a business license and employee registration from the Fort Belknap Tribal Employment Office (TERO) by contacting Nancy Boushie at (406)353-8454 or nboushie@ftbelknap.org. LITTLE RIVER TRADING POST FUEL SYSTEM REMOVAL AND REPLACEMENT. The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Island Mountain Development Group. No Bid shall be withdrawn for a period of 90-days after the scheduled opening without the consent of the OWNER.

Details

1 Story Above Grade, 7,377 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents