Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Hollenbeck Pipe Improvements Project - City of Covina
Infrastructure
Conception
Covina, CA 91723

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 est. value
Half Moon Bay, CA 94019

Maintenance District 10A - Madera Ranchos Water System Improvements Project - Phase II
Term Contract
Bidding
$4,489,252 est. value
Madera, CA 93636

Edwards Air Force Base Water Delivery Structure Repair
Infrastructure
Bidding
Rosamond, CA 93560

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Kelley Park Outfall - City Of San Jose
Infrastructure
Conception
$772,000 est. value
San Jose, CA 95112

Gordon Hill Road Pipeline Replacement Project
Infrastructure
Bidding
$2,450,000 est. value
Valley Center, CA 92082

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Central Service Yard - Water Main Replacement - City Of San Jose
Infrastructure
Conception
San Jose, CA 95112

Arcata Storage Tank-1C Project
Infrastructure
Bidding
$2,200,000 to $2,700,000 est. value
Arcata, CA 95521

Reported 07/02/2022 12:00 AM
Project Title

Altitude Valves at San Gorgonio Reservoirs

Physical Address View project details and contacts
City, State (County) Banning, CA   (Riverside County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents