Similar Projects
Mapleton City Street Rehabilitation Project 2021
Bidding
Mapleton, UT

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Water Line at Vernal Memorial Park
Post-Bid
Vernal, UT 84078

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Dixie Springs Phase I Water System Replacement
Results
Less than $1,000,000 est. value
Hurricane, UT 84737

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Culinary Water Improvements for Elsinore Town
Results
Less than $2,000,000 est. value
Elsinore, UT 84111

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

State Street Waterline Replacment
Results
Murray, UT 84107

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

Excavation and Water System Repair Services
Term Contract
Post-Bid
Park City, UT 84060

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

Last Updated 03/13/2020 04:04 PM
Project Title

2020 Water Line Projects

Physical Address View project details and contacts
City, State (County) Midway, UT 84049   (Wasatch County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: Construction of the 2020 Water Line Projects – 100 N: 100 W. to 200 W., 100 W: 100 N. TO 200 N., 250 N: 200 N. to Center Street, 500 S: Stringtown RD to 250 W., & Valais Area 1. Install approximately 600 lineal feet of 8” water line, replace water service connections and fire hydrants. 2. Pulverize, grade, and compact approximately 39,000 SF of roadway. 3. Install approximately 220 lineal feet of 8” Sewer line, replace sewer service connections.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents