Similar Projects
Courtyard by Marriott
New Construction - 12,000 SF
Conception
$62,000,000 est. value
Colorado Springs, CO 80916

Residence Inn Hotel
New Construction
Design
$62,000,000 est. value
Colorado Springs, CO 80916

Awwa Class Iv Structural Liner
Post-Bid
CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Excavation and Trenching For Utility Work
Results
CO

SEMU, C20MU1, Campsite Renovation Phase II
Infrastructure
Results
Less than $255,000 est. value
Colorado Springs, CO

Kinship Landing
New Construction - 24,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Colorado Springs, CO 80903

Courtyard by Marriott
New Construction - 69,500 SF
Construction
$10,546,000 est. value
Colorado Springs, CO

Hyatt Place
New Construction
Pending Verification
Colorado Springs, CO 80920

Candlewood Suites - Westgate at Powers
New Construction - 56,572 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80916

Colorado Springs Hotel
New Construction - 183,233 SF
Construction
$30,000,000 to $40,000,000 est. value
Colorado Springs, CO

Falcon Commerce Center
New Construction
Construction
$190,000 est. value
Monument, CO 80921

WoodSpring Suites - Colorado Springs
New Construction - 48,660 SF
Construction
$6,500,000 est. value
Colorado Springs, CO 80921

Mesa Ridge Crossing
New Construction
Construction
Fountain, CO 80911

Best Western Plus Executive Residency Fillmore Inn
New Construction
Construction
$6,500,000 est. value
Colorado Springs, CO 80907

Last Updated 03/04/2022 02:59 PM
Project Title

Hampton Inn

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80900   (El Paso County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method
Project Status Construction Commenced November 2019, Construction Completion Expected May 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 4 Stories Above Grade, New Construction 95 Unit(s), 1 Site Development.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents