Similar Projects
Detention Pond Improvement - Pond 2 - PWFC003.0-16 - Village of Mount Prospect
Infrastructure
Conception
$835,000 CJ est. value
Mount Prospect, IL 60056

Detention Pond Improvement - Pond 6 - PWFC004.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Demolition Nelson Sjostrom
Demolition, Infrastructure
Design
$400,000 CJ est. value
Rockford, IL 61103

Construction Services for 51st Street Yard Coach Maintenance Building Demolition
Demolition, Infrastructure
Sub-Bidding
$951,002 CJ est. value
Chicago, IL 60615

Ford Heights Green Streets Project
Alteration
Post-Bid
Ford Heights, IL

Asbestos and Mold Remediation & Air Monitoring
Term Contract, Alteration
Post-Bid
$50,000 est. value
Park Forest, IL 60466

Asbestos Abatement at Jefferson Elementary School
Alteration
Results
Niles, IL 60714

Abatement of Flooring and Lab Tops
Alteration
Results
Breese, IL 62230

City of Canton 360 East Linn Street Structural Demolition and Asbestos Removal
Term Contract, Demolition, Infrastructure
Construction
$164,100 CJ est. value
Canton, IL 61520

638 Whitman Street Demolition
Demolition, Infrastructure
Construction
$28,100 CJ est. value
Rockford, IL 61103

Detention Pond Improvement - Pond 6A - PWFC005.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Summer 2022 Asbestos Work Two School Buildings Field Elementary School and Carpenter Elementary School
Alteration
Post-Bid
$40,000 est. value
Park Ridge, IL 60068

Willow Grove School Asbestos Removal
Infrastructure
Results
Buffalo Grove, IL 60089

RFP - Windam Cove Pollinator Habitat Restoration Project
Infrastructure
Conception
$400,000 CJ est. value
Woodstock, IL 60098

Keyless Access Control System
Renovation
Post-Bid
$31,891 CJ est. value
East Dundee, IL 60118

Last Updated 08/23/2023 12:32 AM
Project Title

Tree Removal on Various State Routes

Physical Address View project details and contacts
City, State (County) Morton, IL 61733   (Tazewell County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvement consists of tree removal on various State routes within various counties in District One. Region : 1 District : 1 Federal Project # : N/a County(S) : Various Key Route(S) : Various Section(S) : 2022 Var Tree Removal State Job #(S) : C-91-089-23 PPS #(S) : 1-81166-0000 Questions not accepted as of September 12, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time,September 12, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 022 - Tree Removal on Various State Routes

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents