Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Well 32 Rehabilitation Re-Bid
Infrastructure
Bidding
$12,266,500 CJ est. value
Santa Ana, CA 92706

Place RHMA-G, HMA, Slab Replacement and JPCP
Infrastructure
Bidding
$23,400,000 CJ est. value
Tustin, CA 92780

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1
Renovation
Post-Bid
$7,900,000 est. value
CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Junior Lifeguards Building - Parking Lot Improvement - City of Newport Beach
Infrastructure
Construction
$450,000 CJ est. value
Newport Beach, CA 92663

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Last Updated 12/12/2022 04:34 PM
Project Title

WRP Sodium Hypochlorite Tank Replacement

Physical Address View project details and contacts
City, State (County) San Clemente, CA 92672   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $394,614 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 12, 2022, the project has not been awarded. A timeline for award has not been confirmed. 55452.01510\32905704.2 The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the plans, specifications and contract documents for the Wrp Sodium Hypochlorite Tank Replacement The work includes but is not limited to removal/disposal of the existing Sodium Hypochlorite fiberglass tank and piping and repair and patching of the associated concrete pad, construction of a new concrete pad and concrete containment walls, coating of concrete surfaces inside of the containment walls, installation of two new HDPE Sodium Hypochlorite tanks, piping and appurtenances, construction of drainage facility improvements located out side of the tank containment walls as well as in the area behind the chemical building. Online Q&A Yes Q&A Deadline August 9, 2022 12:00 PM (PDT) Bid Bond : 10.00% Payment Bond : 100.00% Performance Bond : 100.00% Liquidated Damages $500/day Project Duration 110 working days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents