Similar Projects
Well 4 Water Treatment Plant Upgrades - Phase 1 - GC Bid
Infrastructure
Bidding
$3,000,000 est. value
Maynard, MA

Purchase Raw Water Pump
Infrastructure
Bidding
Lowell, MA

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Post-Bid
Framingham, MA 01701

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Replace Sewer Macerators
Results
Ayer, Devens, MA 01434

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Post-Bid
Belmont, MA

Disconnection and Relocation of Sump Pumps
Results
$1,348,169 est. value
Belmont, MA

Furnish and Deliver Residential Grinder Pump Systems
Post-Bid
Ayer, MA

Well I Redevelopment
Infrastructure
Results
Woburn, MA

Project Is Design, Permitting, Drilling and Installation of Potable Well System
Infrastructure
Post-Bid
Ashby, MA

Salem Street Wellfield Replacement Project Pumping Station - General Bids
Infrastructure
Results
Wilmington, MA 01887

Replacement of the Pine Oaks Water Pump
Infrastructure
Post-Bid
Natick, MA

Salem Street Wellfield Replacement Project Pumping Station - Filed Sub Bids
New Construction, Infrastructure
Results
Wilmington, MA 01887

Cleaning and Redevelopment of Howard Road and Nutting Road Wells
Infrastructure
Post-Bid
Westford, MA 01886

Last Updated 06/21/2022 11:34 PM
Project Title

Route 128 and Nickerson Field Wells Abandonment Project

Physical Address View project details and contacts
City, State (County) Weston, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Weston, Massachusetts. Completed plans call for site work for a water / sewer project. The work of this contract generally consists of, but is not limited to, capping and abandoning the Route 128 and Nickerson Field Wells. Additional work includes removal of a hydrant and valve boxes, sealing penetrations to vaults, and removal of above ground equipment. Work at the Nickerson Field Well site also includes the removal of a hydrant and valve boxes, removal of a vent pipe from the well vault, and sealing all penetrations to the well vault. Additional work at the Route 128 Well site includes removal of a hydrant and valve boxes, removal of above ground electrical equipment, sealing of all penetrations to the well vault, removal of small diameter trees within the fence line of the well vault, sealing all penetrations on the transformer, removal of the fencing around the transformer pad. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Each bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond in the amount of 50% and Labor and Materials Payment Bond in the amount of 100% of the contract price will be required. Minimum wage rates as determined by the Commissioner of Department of Workforce Development under the provision of the M.G.L. c. 149, 26 to 27D, as amended apply to this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents