Similar Projects
Last Updated | 03/31/2021 09:33 AM |
Project Title | 2021 Sewer Main Lining |
Physical Address | View project details and contacts |
City, State (County) | Keene, NH (Cheshire County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Sewer Main Lining Project consists of the following tasks: 1. Provide sewage bypass pumping to accommodate up to two times the peak measured flow of approximately 500 GPM for a minimum distance of 400 feet. 2. Clean and video inspect sewer pipe, root cutting as necessary. Construct Cured In-Place Pipe (CIPP) Class III structural lining within 16, 18 and 20-inch Asbestos Cement (AC) pipe. Provide sprayed-in epoxy sewer manhole lining, up to 20 vertical feet in 2 structures. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |