Similar Projects
I-75 Reconstruction
Infrastructure
Bidding
MI

0.08 Mi of Culvert Replacement Includes Hot Mix Asphalt Road Reconstruction, Earthwork and Pavement Markings
Infrastructure
Bidding
MI

Installation of an Enclosed Ditch Along Lincoln Road
Post-Bid
Ithaca, MI

Twin Lake Channel Maintenance
Post-Bid
Muskegon, MI 49445

Walker Drain Culvert Replacement at Dixboro Road
Results
Ann Arbor, MI

Shoreline Protection Project on Us-23 in Presque Isle County Approximately 3 Miles North of Rogers City
Results
Rogers City, MI

0.01 Mi of Culvert Repair and Slope Restoration
Infrastructure
Bidding
Allegan, MI 49010

Shore Protection
Post-Bid
Mancelona, MI 49659

Brandenburg Park Shoreline Restoration
Results
Chesterfield Township, MI 48047

Schoolcraft Township Big Traverse Marina Seawall Repairs
Infrastructure
Bidding
Lake Linden, MI

Iron Belle Trail Bridge
Post-Bid
Petoskey, MI 49770

Parking Lot Drainage
Results
Less than $3,700 est. value
Caro, MI

Baldwin Road at Corrigal Drain Culvert
Alteration
Bidding
$101,000 est. value
Flint, MI

Quanicassee Road Grade, Base, Drainage
Post-Bid
Caro, MI 48723

Warber Drain Drainage Improvements
Results
West Olive, MI

Last Updated 09/15/2021 08:08 AM
Project Title

WCRC and Trout Unlimited Culvert Removal and Replacements

Physical Address View project details and contacts
City, State (County) MI   (Wexford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Culvert #6: 60 Lft of 72” Poly-Coated CMP Culvert on 3 ¾ Road, Slagle Township, Section 29 Culvert #7: 34 Lft of 6 ’x 4’ Concrete Box Culvert on 34 ½ Road, Slagle Township, Section 29 Culvert replacements This work involves the removal and placement of the culverts and materials per the attached plans. Please note, the 6’ x 4’ concrete box culvert will be purchased directly by the Road Commission. The 72” CMP culvert is to be purchased by the contractor and included in lump sum bid. All work including traffic control shall be included in each lump sum item for each culvert. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans. The contractor will need to provide traffic control and may construct them part width while maintaining traffic or complete the projects in less than 7 days of closure time. If contractor chooses to close the road it must be done correctly including Type 3 barricades and Road Closed to Through Traffic signs with advance warning at the nearest intersections and Type 3 barricades and road closed signs at the culvert location. Contractor responsible for proper signing and to maintain safe construction area at each location until the roadway is open to traffic

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents