Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Guaranteed Energy and Water Conservation Services
Infrastructure, Alteration
Post-Bid
Irmo, SC

Hanger Fans
Term Contract
Post-Bid

Commercial Electrical Repair and Installation Services
Term Contract
Results
Lexington, SC

Data Center Ups Battery Replacement
Results
Columbia, SC

Uninterruptible Power Supply (UPS)
Alteration
Post-Bid
Columbia, SC

Data Center B Side Ups Upgrade
Results
$1,750,000 to $2,000,000 est. value
Columbia, SC

Wil Lou Gray Opportunity School - Relocate Overhead Primary to Underground
Alteration
Post-Bid
$100,000 to $140,000 est. value
West Columbia, SC 29170

Canopy Lighting Project at Chapin Intermediate School
Alteration
Results
$10,000 to $20,000 est. value
Chapin, SC 29036

Uninterrupted Power Supply (UPS) Engineering and Maintenance Services
Term Contract, Alteration
Post-Bid

Replace Automatic Transfer Switch
Alteration
Results
Columbia, SC

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Two (2) Fire Station Generators
Alteration
Results
$47,000 est. value
Lexington, SC

Generator Maintenance Services
Alteration
Post-Bid
Lexington, SC

Repair Leaking Transformer
Alteration
Results
Columbia, SC

Last Updated 09/08/2022 10:35 AM
Project Title

Consumer Protection Laboratory Backup Generator and Hemp Testing Equipment

Physical Address View project details and contacts
City, State (County) West Columbia, SC 29172   (Lexington County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Addition of backup generator for Consumer and Metrology Labs Project Location: 123 Ballard Ct. West Columbia, SC 29172. Construction Cost Range: $700,000 to $750,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents