Similar Projects
Lime Sludge Handling Process - City of Margate
Infrastructure
Conception
$5,000,000 CJ est. value
Margate, FL 33063

West Central Boulevard Wet Pond - SW-6 - City of Cape Canaveral
Infrastructure
Conception
$2,500,000 CJ est. value
Cape Canaveral, FL 32920

Structure Demolition
Demolition, Infrastructure
Design
$200,000 CJ est. value
Bunnell, FL 32110

2022-NFWF-Wetland Restoration
Infrastructure
Bidding
$300,000 CJ est. value
Cape San Blas, FL 32456

Intracoastal Waterway Jacksonville to Miami - Maintenance Dredging, 12- Foot Project, Palm Valley, South Reach
Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Jacksonville, FL 32202

Liberty Park Basketball Court Demo and Installation
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Palm Bay, FL 32909

Mold Remediation
Alteration
Post-Bid
Hollywood, FL 33021

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Environmental Services
Term Contract
Results
Jacksonville, FL

Water Monitoring Services, Term Contract
Term Contract
Results
Ocala, FL

MLK Demolition
Demolition, Infrastructure
Construction
$250,000 CJ est. value
Panama City, FL 32401

Mold Remediation
Renovation
Construction
$11,250 CJ est. value
Gainesville, FL 32601

International Drive Wet Pond - SW-5 - City of Cape Canaveral
Infrastructure
Conception
$300,000 CJ est. value
Cape Canaveral, FL 32920

Plumbing, Electrical, HVAC, Re-Roofing, Custodial Services, and Window Replacement Service Contractors
Term Contract
Sub-Bidding
Chiefland, FL 32626

Brownsville - 3300 West Desoto Street Asbestos Abatement
Alteration
Post-Bid
Pensacola, FL 32505

Last Updated 12/02/2022 01:39 PM
Project Title

M.C. Davis, CR 283, and CR 83 Combined Signalization Project

Physical Address View project details and contacts
City, State (County) Defuniak Springs, FL 32433   (Walton County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,496,704 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2, 2022, project was awarded C.W. Roberts Contracting, Inc., awarded amount is $3,496,703.54. The subject work consists of three projects under one Contract. The intent of the work is to install new mast arm traffic signals, widen roadway approaches to the intersections and mill and resurface, modify walkways, and construct new signing and marking at the following three intersections: County Road (CR) 283 at CR 30A, CR 83 at 30A, and MC Davis Blvd. at US 98 (SR 30). FDOT Permit 2020-A-390-00002 applies to the MC Davis project. Attendance will be confirmed via roll call at no later than 5 minutes after the designated start time and any Bidder not present for the roll call will not be eligible to bid on the project. Last date to submit questions is November 2nd, 2022, no later than 12:00 Noon. All questions are to be directed in writing to the Purchasing Manager. Questions received after such date and time will not be answered. All questions about the meaning or intent of the Contract Documents are to be directed in writing to the County Purchasing Manager through electronically.Questions must be submitted to purchasing no later than 12 o’clock noon on november 2, 2022. Only questions answered by Formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents