Similar Projects
Plumbing and Boiler Maintenance Services
Term Contract
Post-Bid
Edgewater, NJ

Emergency Boiler Replacement
Alteration
Post-Bid
Fort Lee, NJ 07024

Boiler Restoration and Partial Replacement
Alteration
Results
Lodi, NJ 07644

Boiler Replacement
Alteration
Results
Carlstadt, NJ

Boiler Cleaning, Maintenance, Service and Repair
Term Contract
Post-Bid
Fort Lee, NJ

Boiler Valve Replacement
Alteration
Results
NJ

Inspection, Maintenance, Repair and Installation Services for Commercial Walk-in and Reach-in Refrigerators and Freezers, and Other Kitchen Equipment
Term Contract
Post-Bid
Fort Lee, Jersey City, Weehawken, NJ 07310

Boiler Replacement Projects at Calvin Coolidge School and George Washington School
Alteration
Results
Edgewater, Hillside, NJ 07020

Mechanical System Upgrades at Two Schools
Alteration
Post-Bid
$1,734,000 est. value
Tenafly, NJ

Bogota BOE Energy Savings Improvements
Alteration
Results
Bogota, NJ 07603

Boiler and Domestic Hot Water Heater Replacement
Alteration
Post-Bid
$120,000 est. value
Edgewater, NJ 07020

Bogota BOE Ventilation Improvement/Energy Savings Improvements
Alteration
Results
Bogota, NJ 07603

Boiler Replacement at the Meadowbrook School
Renovation
Post-Bid
$175,000 CJ est. value
Hillsdale, NJ 07642

Boiler Replacement at Ramapo High School
Alteration
Results
Franklin Lakes, NJ 07417

Boiler Maintenance and Repair Work
Alteration
Post-Bid
Demarest, NJ

Last Updated 12/20/2022 11:18 AM
Project Title

Boiler Replacement at High Mountain Road School

Physical Address View project details and contacts
City, State (County) Franklin Lakes, NJ 07417   (Bergen County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $638,751 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Boiler Replacement at High Mountain Road School School Project Description: Project name is Boiler Replacement at High Mountain Road School for the Franklin Lakes Board of Education and further identified as Di Cara | Rubino Project No.3971 on Contract Documents prepared by Di Cara | Rubino Architects.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents