Similar Projects
Water Treatment Plant
Design
Less than $7,400,000 est. value
Rouses Point, NY 12979

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Water Treatment Plant - (WTP) Chemical Fee Systems Improvements - Contract 1G - General Construction
New Construction
Bidding
Amsterdam, NY 12010

Advanced Oxidation Process Treatment at Merry Lane - General Construction
Renovation
Bidding
Jericho, NY 11753

Water Treatment Plant - Phase II Improvements
Renovation, Addition
Sub-Bidding
$10,000,000 est. value
Williamson, NY

Tivoli Wellhouse and Wellfield Improvements
Post-Bid
Tivoli, NY 12583

Chadwick Lake Filter Plant Resiliency Improvements
Renovation
Post-Bid
Newburgh, NY 12550

Upgrades to the Water Treatment Plant's Junction Chamber and Pretreatment Buildings (AS)
Results
Yonkers, NY 10703

Wastewater Treatment Plant Flood Mitigation
Results
Endicott, NY 13760

Sleepy Hollow Lake WWTP Upgrade
Renovation
Construction
Athens, NY 12015

Village of Red Hook Sewer Project
New Construction
Construction
Red Hook, NY

Water Dynamic Corp Storage Building
New Construction, Renovation - 2,291 SF
Pending Verification
Less than $500,000 CJ est. value
Southold, NY 11971

Water and Wastewater Treatment Plants
New Construction
Bidding
Brewster, NY

Sylvan Beach WWTP Site Soil Preload Project
Post-Bid
Less than $850,000 est. value
Sylvan Beach, NY 13157

Water Treatment Plant Soda Ash System Improvements
Results
Less than $620,000 est. value
Watertown, NY 13601

Last Updated 04/18/2022 06:07 AM
Project Title

Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Lowville, NY 13367   (Lewis County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $820,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 - General Construction - $765,000 Contract 2 - Electrical - $55,000 Constructing a new granular activated carbon filtration system.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents