Similar Projects
Sherman Field Press Box #25
Results
$1,050,000 est. value
Houghton, MI

Kearly Stadium - Sherman Field Press Box
Results
Less than $1,400,000 est. value
Houghton, MI

BP3 – Athletic Facilities - Stadium and Field
Results
Swartz Creek, MI

Outdoor Stadium Technology Renovations
Results
Rockford, MI

Soccer & Baseball Improvements
Renovation
Construction
$1,500,000 to $2,000,000 est. value
Muskegon, MI 49441

Hamtramck Stadium
Renovation
Conception
$490,729 est. value
Hamtramck, MI 48212

Michigan Stadium – 2018-2019 Athletics Maintenance and Repairs Bidpack 02 - Waterproofing Repairs
Post-Bid
Ann Arbor, MI 48109

Cambridge High School Pavement Improvements and Garden City High School Stadium Improvements
Post-Bid
Garden City, MI 48135

Clio High School Stadium Enhancements
Post-Bid
Clio, MI 48420

Hamtramck Stadium Restoration
Renovation
Post-Bid
Hamtramck, MI 48212

Football Stadium Concrete Repairs
Renovation
Post-Bid
Otsego, MI

BP 6B Stadium Field House
Results
Ypsilanti, MI 48197

Birmingham Ice Arena- Addition and Renovation
Renovation
Bidding
Birmingham, MI 48009

High School Football Press Box
Bidding
Essexville, MI

Last Updated 07/30/2020 12:29 PM
Project Title

FPM - Football Stadium Elevator - 2019

Physical Address View project details and contacts
City, State (County) Detroit, MI   (Wayne County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Football Stadium Elevator project is an elevator and bridge addition providing access to the Adams Field Stadium Pressbox from the Stadium Auxiliary Building below. The 3,500 lb traction elevator is an occupant evacuation type elevator providing barrier free access to the pressbox and accessible egress from the pressbox back to grade level. Work includes a 69' tall reinforced CMU hoistway tower and a steel framed, metal sided, 28' long enclosed bridge containing an elevator lobby and area of refuge. Work also includes an elevator lobby and support spaces in the Stadium Auxiliary Building and alterations to the pressbox interior to accommodate the new accessible entrance. The existing top concrete stadia is extended in areas north and south of the bridge to accommodate egress from the bridge. Mechanical and electrical work incudes modifications to the Stadium Auxiliary Building and pressbox MEP systems in areas impacted by the new work, emergency generator, hoistway ventilation, electric heat at the bridge level and a fire alarm system that includes hazard areas of the Stadium Auxiliary Building.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents