Similar Projects
South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

2023 CDBG Sidewalk Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Bay City, MI 48708

2023 CDBG Sidewalk Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Bay City, MI 48708

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Reseal Stripe HR Parking Lots
Term Contract
Results
Bay City, MI 48708

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

2023 Bond - Bangor Township Schools
Addition, Renovation, Infrastructure
Pending Verification
$3,315,000 CJ est. value
Monitor Charter Township, MI 48706

Kawkawlin River Access Improvements at Steih Memorial Park
Infrastructure
Bidding
$500,000 CJ est. value
Bay City, MI 48706

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Post-Bid

2022 Drinking Water Revolving Fund Project Plan Water System Improvements
Infrastructure
Results
Bay City, MI

PNC Bank ADA Parking Lot Upgrades - North Euclid Ave. Bay City
Infrastructure
Bidding
$500,000 CJ est. value
Bay City, MI 48706

Last Updated 04/06/2023 01:03 AM
Project Title

Road Reconstruction Midland Road - Flajole Rd to Carter Rd

Physical Address View project details and contacts
City, State (County) Williams charter Township, MI 48611   (Bay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,376,668 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1.1 Miles of HMA reconstruction. Project inclusive of HMA base crushing and shaping, drainage improvements, and signage and markings. project is located in Williams Township, Bay County Michigan between Flajole Rd and Carter Road. DEPOSIT: 5% of bid amount The project shall be opened to traffic no later than October 15, 2023. The project shall have a final completion, including restoration by a date of November 1, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents