Similar Projects
New Gym Floor Demo and Replacement at The Englewood Campus
Bidding
CO

Secondary Building Gymnasium Floor Refinishing
Bidding
Dove Creek, CO

ACC DQ 20-6-1018 Carpet Replacement (Tandus)
Post-Bid
Colorado Springs, CO

Lowry Classroom Flooring
Post-Bid
Aurora, CO

CU South 1st Great Hall Renovation Paint / Carpet
Results
Less than $50,000 est. value
Aurora, CO 80045

Mercury Removal Services Package 02
Results
Colorado Springs, CO 80905

Grand Junction Regional Airport Flooring Replacement
Construction
Grand Junction, CO 81501

Summit Hall 4th Floor Corridor Flooring
Bidding
Fort Collins, CO 80521

Wood Floor & Carpet Cleaning And Maintenance
Post-Bid
Lone Tree, CO

Mercury Removal Services Package 01
Results
Colorado Springs, CO 80905

NRRC-D Building Carpet Replacement
Bidding
Fort Collins, CO 80526

1161 Transit Drive - Floor Leveling
Post-Bid
Colorado Springs, CO 80903

CTCF Kitchen Floor Replacement
Results
$750,000 est. value
Colorado Springs, CO

Carpet Removal and Installation
Term Contract
Bidding
Brighton, CO

Golf Course Restroom Tile Projects
Post-Bid
Denver, CO 80202

Last Updated 03/19/2021 06:01 PM
Project Title

Citywide Floor Replacement

Physical Address View project details and contacts
City, State (County) Broomfield, CO 80020   (Broomfield County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Remove and dispose of the existing carpet tile/sheet vinyl flooring to be replaced according to all applicable legal requirements. B. Ensure that excess materials on the substrate, that would prevent the proper installation of the new flooring, are removed and disposed of properly. C. Do not stockpile material, remove and dispose quickly. D. Coordinate with the City representative regarding any disposal containers that may be required for the project; any related costs for the disposal containers and associated equipment, including drop-off and pick-up, are at the Contractor’s sole expense. E. Do not reuse any removed material unless the City representative so authorizes.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents