Similar Projects
RFP - Construction Management Services for Water & Sewer System Infrasture
Term Contract
Sub-Bidding
Washington, DC 20036

FY 2024 Safe at Home Program
Term Contract
Sub-Bidding
Washington, DC 20036

Sanitary Sewer Lateral Replacement Contract
Term Contract
Post-Bid
Washington, DC 20036

Job Order Contract (Joc) Systems Consulting Services
Term Contract
Post-Bid
Washington, DC

DCKT-2022-Parking Enforcement System
Term Contract
Sub-Bidding
Washington, DC 20036

Generator Maintenance
Term Contract
Post-Bid
Washington, DC 20036

FY22 Flood Smart Homes
Term Contract
Post-Bid
Mountain Top, WA 99328

Indefinite Delivery/ Indefinite Quantity Hazardous Materials for Smithsonian Institution
Term Contract
Post-Bid
Washington, DC 20024

GPO Command Center Project Management
Term Contract
Post-Bid
Washington, DC 20401

Construction Management Technical Support Systems (CMTSS)
Term Contract
Post-Bid
Washington, DC 20036

Water Treatment Services for Boilers and Water Systems
Term Contract
Post-Bid
Washington, DC 20036

FY22 Specialized Residential Services (Jul)
Term Contract
Post-Bid
Washington, DC 20036

On-Call, As Needed Hazardous Material Abatement Services
Term Contract
Post-Bid
Washington, DC 20036

Wastewater Treatment Facility Basic Ordering Agreement
Term Contract
Post-Bid
Washington, DC 20036

Network Infrastructure Extension Solicitation
Term Contract
Post-Bid
Washington, DC 20036

Last Updated 07/10/2023 01:02 AM
Project Title

N036--DC Fire Doors Inspection Repair for Compliance

Physical Address View project details and contacts
City, State (County) Washington, DC 20310   (District of Columbia County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

WASINGTON DC VAMC FIRE DOOR REPAIRS Provide all parts and labor to correct deficiencies and bring all fire door assemblies into compliance with current regulations found in the latest inspections preformed. Repairs and ratings shall be in accordance with the most recent edition of The National Fire Protection Association s (NFPA) standard NFPA 80: Standard for Fire Doors and Other Opening Protectives, Chapter 5 Inspection, Testing, and Maintenance . Please note that all the deficient items to be replaced are found in the most recent fire door inspection report. All repairs shall be in accordance with the equipment manufacturer s requirements and\or applicable laws, regulations, codes, etc. An extension may be granted at the discretion of the COR under the direction of the CO on a case by case basis. Each request for an extension must include and explanation for the delay, and estimated time of completion, and evidence to clearly show that the contractor has made every effort to repair the door assembly as timely as possible. The Contractor shall furnish all supplies, materials, and equipment to perform repairs. All parts and materials shall be of the original manufacturer s design and specification, or equal thereto.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents