Similar Projects
Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Design
$1,000,000 to $5,000,000 est. value
Gainesville, FL 32608

Orange County Public Works Chiller Replacement Building 1 and 2
Alteration
Bidding
$400,000 est. value
Orlando, FL 32839

Maintenance and Repair of Two Cleaver Brooks Boiler
Alteration
Bidding
Miramar, FL 33027

Cooling Tower Piping Improvements and Site Hw Underground Piping Improvements
Infrastructure
Sub-Bidding
Bradenton, FL 34204

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

FAU Boca Building 38 Boiler Replacement and Electrical Switch Gear Upgrade
Post-Bid
Boca Raton, FL 33431

J--Service: Gainesville Chiller Plant Maintenance
Results
Gainesville, FL 32608

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Water and Wastewater Treatment
Term Contract
Bidding
FL

Rehabilitation Work - 7332 Johnson Road
Post-Bid
Less than $10,000 est. value
Port Richey, FL 34668

Repair Munters ADU-300 Unit at Everglades National Park
Results
Homestead, FL 33030

Boiler and Water Heater Inspections and Repairs
Term Contract
Bidding
$75,000 est. value
FL

Rehabilitation Program - 7531 Jenner Avenue
Post-Bid
Less than $10,000 est. value
New Port Richey, FL 34655

J041--Steam Station - Repair/Replace Please Read Notice Thoroughly
Results
Miami, FL 33125

Chiller Replacement Project, St. Augustine Campus
Alteration
Bidding
Saint Augustine, FL 32084

Last Updated 02/21/2022 10:59 AM
Project Title

Peabody Auditorium HVAC Chiller Plant

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32118   (Volusia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,020,000 to $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to provide all necessary labor, material, equipment, supervision, and permitting necessary to provide the construction of a new CMU chiller plant building in parking lot of the Peabody Auditorium located at 600 Auditorium Blvd., Daytona Beach, FL 32118, The Contractor will F&I new chiller system, boilers, outside air make-up system, and all plumbing and electrical.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents