Last Updated | 05/04/2023 11:36 AM |
Project Title | Wright Road Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Norwalk, IA 50211 (Warren County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Civil Engineer - 04/12/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct Wright Road Water Main Replacement project including all labor, materials and equipment necessary to construct approximately 7,920 linear feet of 12-inch water main by open cut, 1,000 linear feet of 12-inch water main by trenchless construction, hydrants, valves, fittings, connections to the existing system, service reconnections, traffic control, pavement removal and replacement, surface restoration, erosion control and miscellaneous associated work, including cleanup. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City of Norwalk, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC The Certified Check, Certified Share Draft or Cashier's Check may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of the City. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |