Similar Projects
Holland Pointe Lift Station - SAN-18-001 - City of Norwalk
New Construction, Infrastructure
Conception
$723,500 CJ est. value
Norwalk, IA 50211

Timber View Park And Blooming Heights - P&R-17-004 - City of Norwalk
Infrastructure
Conception
$700,000 CJ est. value
Norwalk, IA 50061

Highway 28 & Beardsley Intersection Improvements - STR-16-005 - City of Norwalk
Infrastructure
Design
$3,500,000 CJ est. value
Norwalk, IA 50211

Highway 28 & Beardsley Intersection Improvements - STR-16-005 - City of Norwalk
Infrastructure
Design
$3,500,000 CJ est. value
Norwalk, IA 50211

PCC Patching - IOWA 14
Infrastructure
Bidding
$1,000,000 CJ est. value
Indianola, IA 50125

PCC Patching - IOWA 14
Infrastructure
Bidding
$1,000,000 CJ est. value
Indianola, IA 50125

Sewer Manhole Rehabilitation by Lining Process
Infrastructure
Post-Bid
$80,000 CJ est. value
Indianola, IA 50125

Sewer Manhole Rehabilitation by Lining Process
Infrastructure
Post-Bid
$80,000 CJ est. value
Indianola, IA 50125

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Sunset Dr/IA Highway 28 and North Avenue Intersection Improvements
Infrastructure
Results
$2,088,769 est. value
Norwalk, IA

Indianola Daycare
New Construction, Infrastructure - 10,527 SF
Construction
$1,000,000 CJ est. value
Indianola, IA 50125

Storm Sewer - City Of Indianola
Infrastructure
Pending Verification
$600,000 CJ est. value
Indianola, IA 50125

Storm Sewer - City Of Indianola
Infrastructure
Pending Verification
$600,000 CJ est. value
Indianola, IA 50125

Traffic Signals at Highway 28 And Echo Drive - STR-16-012 - City of Norwalk
Infrastructure
Conception
$400,000 CJ est. value
Norwalk, IA 50211

Construction of Wastewater System Improvements
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Hartford, IA 50118

Last Updated 05/04/2023 11:36 AM
Project Title

Wright Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Norwalk, IA 50211   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer - 04/12/23
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Wright Road Water Main Replacement project including all labor, materials and equipment necessary to construct approximately 7,920 linear feet of 12-inch water main by open cut, 1,000 linear feet of 12-inch water main by trenchless construction, hydrants, valves, fittings, connections to the existing system, service reconnections, traffic control, pavement removal and replacement, surface restoration, erosion control and miscellaneous associated work, including cleanup. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City of Norwalk, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC The Certified Check, Certified Share Draft or Cashier's Check may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of the City. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents